Skip to content

Temporary Building at Mac Robertson Girls School

07/11/2022
Melbourne, Victoria
  • Temporary Structures

When Mac Robertson was challenged with the construction of an existing building, they couldn’t go without the critical space for their students for an extended period of time. Sitting down with the principal of Mac Robertson, Moreton Hire proposed the most appropriate solution for the school – which was to erect a fully-fitted temporary structure in place of the study area that was unusable during renovations. The space works perfectly for the students and for its intended purpose, and was the long-term hire solution they needed until constructed was completed on their new building.

“This marquee was the perfect solution to our renovation space problem. The communication, advice and professionalism of the Moreton Hire team on site was fantastic, and we were thrilled with the ongoing support Kevin has provided”
– Sue Harrap (Principal)

Case Study Details

The structure used was a 6x12m Multiflex Arcum Marquee, fully fitted out. It is a European designed and manufactured marquee structure, featuring cassette timber floors, vertical glass and solid wall panels, double glass door opening, ramping, lightingHVAC and vinyl roof.

Interested In Temporary Structures

See how Moreton Hire can help your venue, school or business increase capacity, protect your outdoor spaces from the elements, or turn currently un-used areas into usable space. Contact us with your project details today.

Interested to Hear More?

Contact our team today and discuss your upcoming project.