Temporary Building at Mac Robertson Girls School

When Mac Robertson was challenged with the construction of an existing building, they couldn’t go without the critical space for their students for an extended period of time. Sitting down with the principal of Mac Robertson, Moreton Hire proposed the most appropriate solution for the school – which was to erect a fully-fitted temporary structure in place of the study area that was unusable during renovations. The space works perfectly for the students and for its intended purpose, and was the long-term hire solution they needed until constructed was completed on their new building.